Website powered by

Uragan 5.5K

A bit of work from a prior employer. This was imported into a fixed pipeline, so only diffuse was used. The higher end assets were kept on hand for future reconstruction in other engines.

Uragan Tire High

Uragan HIGH for bake down

Uragan 5.5K